Warning: Attempt to read property "id" on null in /var/www/www.allenhpe.co.uk/public_html/components/com_k2/router.php on line 341
Glenmorangie Distillery Expansion
Box image

Process
Engineering
Design
for
distillers

Process
Engineering
Design
for
distillers

Whether it is an initial audit or a full distillery design, every Allen Associates client receives the same professional, market leading approach and attention to detail.

Find out more
 

Box image

Packaged
Supply
Solutions
for
distillers

Packaged
Supply
Solutions
for
distillers

We work closely with each client to develop a bespoke offer that will meet the distillery’s exact process plant requirements in the most cost efficient way.

Find out more
 

Box image

Process
Safety
Solutions
for
distillers

Process
Safety
Solutions
for
distillers

Since our formation in 1995, we have been providing industry-leading process safety solutions for distillers & plant operators across the UK & overseas.

Find out more
 

Box image

Net
Zero
Solutions
for
distillers

Net
Zero
Solutions
for
distillers

Utilising the latest technology we help distillers maximise their energy efficiency & generate significant cost savings in the process.

Find out more
 

Glenmorangie Distillery Expansion

Grand Designs at the Glen of Tranquility

When The Glenmorangie Company decided to increase spirit production at Glenmorangie Distillery by 50%, the company looked to Allen Associates (HPE) Ltd to help them out.

mash tun

The Project

Allen Associates took control of the entire process, managing the project from process design through to implementation and commissioning. This was achieved whilst meeting production targets and maintaining the aesthetics of the distillery.

The project required a complete re-design of the distillery including: new grist handling equipment, mash tun, washbacks, wash stills, spirit stills, boiler, cooling tower, CIP plant and an energy efficient and cost saving condenser heat recovery system.

One of the requirements of the project was to reduce the mash tun cycle time from 7.5 hours to 5 hours without compromising yield and spirit quality. Existing mashing processes were analysed and improvements were identified and implemented.

The full suite of services offered to Glenmorangie included Process & System Design, Project Management, Utilities & Efficiency Optimisation, Surveys, H&S (DSEAR, HAZOP), Hygienic Processes, 3D Plant Layout Modelling & Drawings, and Problem solving. 

mash systems

Results

Glenmorangie benefited from a number of efficiency savings as a direct result of the project:

  • Increasing production at the distillery from 4mla to 6mla.
  • Reduction of specific energy consumption (kW/laa)
  • Increased mash tun size achieved the correct bed depth and optimised drainage times
  • A new draff removal system decrease draff removal time
  • A new grist elevator was installed to reduce mashing in time
  • A condenser hot water recovery system was installed to recover heat from the condensers and transfer it to both the mashing and still charging processes.
  • Mash tun CIP system to improve mash tun cleaning and reduce both the mash tun cleaning cycle time and the need for confined space entry

 

 

Additional Info

  • Sub Categories: Process-Engineering-Design
  • Thumbnail:

    glenmorangie th

  • Thumbnail over:

    glenmorangie th over

  • Thumbnail text: Expansion - Glenmorangie